Fort Myers flat roof replacement with removal of three roofing systems, lightweight concrete, metal deck replacement, new wood deck, tapered Poly-ISO, GenFlex roofing, and a 20-Year NDL warranty.
MooreCorp removed three layers of old roofing material, including lightweight concrete, removed the metal roof deck, installed a new wood deck with new ledger board connections and wood, installed tapered Poly-ISO, and completed the system with GenFlex roofing. The project lasted approximately 20 weeks during rainy season. Manufacturer engineering representatives flew in to witness the installation because roofing in rainy Southwest Florida conditions is exceptionally difficult.






MooreCorp can evaluate your property, document conditions, and create a scope for repair, replacement, waterproofing, aluminum work, or maintenance.