Pinebrook Lakes Complete Structural Flat Roof Replacement

Fort Myers flat roof replacement with removal of three roofing systems, lightweight concrete, metal deck replacement, new wood deck, tapered Poly-ISO, GenFlex roofing, and a 20-Year NDL warranty.

CommunityPinebrook Lakes
LocationFort Myers
DurationApprox. 20 weeks
Warranty20-Year NDL
Project Overview

Documented project experience for serious decision makers.

MooreCorp removed three layers of old roofing material, including lightweight concrete, removed the metal roof deck, installed a new wood deck with new ledger board connections and wood, installed tapered Poly-ISO, and completed the system with GenFlex roofing. The project lasted approximately 20 weeks during rainy season. Manufacturer engineering representatives flew in to witness the installation because roofing in rainy Southwest Florida conditions is exceptionally difficult.

  • Three roofing systems removed
  • Lightweight concrete removed
  • Metal roof deck removed
  • New wood deck installed
  • New ledger board connections
  • Tapered Poly-ISO insulation
  • GenFlex roofing system
  • 20-Year No Dollar Limit warranty
Pinebrook Lakes Complete Structural Flat Roof Replacement
Project Gallery

Visual documentation

Planning a similar project?

Use this project as a benchmark.

MooreCorp can evaluate your property, document conditions, and create a scope for repair, replacement, waterproofing, aluminum work, or maintenance.

Request a Property Assessment

Submit the details and MooreCorp can follow up to schedule a review.

Call NowSchedule Inspection